Oracle Banking Payments · Implementation

Oracle Banking Payments implementation, built around the networks your bank clears through.

Domestic, cross-border and instant payments on one hub, with ISO 20022 messaging, routing and repair, and a clear handoff to the core.

  • SWIFT CBPR+
  • SEPA · SEPA Instant
  • Local RTGS and ACH
  • Book transfers

Where OBPM projects spend their time

Oracle Banking Payments is a payments hub. Oracle ships network rules for major schemes such as SWIFT, SEPA and SEPA Instant. It cannot ship your local clearing rules, your channels, your sanctions vendor or your cut-off times, and that is where most of the effort goes.

So we start with the network map: every scheme the bank clears through, every channel that initiates payments and every system that has to see the status.

Network map

Everything OBPM connects

ChannelsMobile and internet bankingBranch and tellerCorporate files and host-to-hostOpen banking APIs
Payments hubOracle Banking Payments
  • Validation
  • Routing matrix
  • Repair queues
  • ISO 20022
  • Charges
  • Status tracking
NetworksSWIFTCBPR+SEPASCT · InstLocal RTGShigh valueLocal ACHbatch
Core bankingFLEXCUBE, pre-integrated, or another core: accounts and GL postings
Sanctions and AMLYour screening vendor, with hits back in a repair queue
Reconciliation and reportingNostro, settlement accounts, regulatory reports
The journey of one payment

Eight stops between the channel and the core

  1. 1InitiateChannel, file or API
  2. 2ValidateNetwork and bank rules
  3. 3ScreenSanctions and AML
  4. 4RouteNetwork by amount, currency, cut-off
  5. 5MessageISO 20022 MX or local format
  6. 6SettleClearing or correspondent
  7. 7PostAccounts and GL in the core
  8. 8StatusBack to the channel and customer

Repair queue catches anything stages 2–4 reject, with a full audit trail.

Most of a project’s effort sits in stages 1, 3, 6 and 7: your channels, your screening vendor, your clearing rules and your core.

Routing

The routing matrix decides the network

We design it with operations, so the rules match how the bank actually clears today, and test every row against cut-off times.

CurrencyAmountTimeNetwork
EURUp to the scheme limit24/7SEPA Instant
EURAnyBefore cut-offSEPA Credit Transfer
LocalHigh valueRTGS hoursLocal RTGS
LocalLow valueBatch windowsLocal ACH
OtherAnyCorrespondent hoursSWIFT CBPR+

Example rows. Your matrix comes from your networks and limits.

Round the clock

Instant payments keep running while the core closes the day

Core (FLEXCUBE)
Online dayEOD
OBPM instant
Accepting and settling 24/7
How postings made during the core’s EOD reach the accounts is designed and tested before go-live.
ISO 20022

Messages mapped per network

For every network we specify which messages the bank sends and receives, how fields map to the core and the channels, and where MT is still needed.

  • pacs.008
  • pacs.009
  • pacs.002
  • pacs.004
  • camt.056
  • camt.029
  • camt.053
  • camt.054

Examples. The supported list depends on the OBPM release and the networks configured.

How we implement OBPM

How we implement OBPM

  1. 01DiscoverNetworks, flows, volumes, cut-offs, channels and screening, the current repair process.
  2. 02DesignOBPM topology, network setup, routing matrix, accounting and integration with the core, HA and DR for round-the-clock operation.
  3. 03Build and integrateConfiguration, ISO 20022 mapping, adapters for channels, clearing gateways, SWIFT and screening.
  4. 04TestEnd-to-end tests with channels, volume and cut-off tests, and the test cycles the clearing operator and SWIFT require.
  5. 05Go live and runHypercare, then SLA-based L1, L2 and L3 support, 24x7x365 for payment operations.
New hubImplementationOBPM for a bank that clears through core modules or satellite systems today.
From FT and PCMigrationPayments moved from FLEXCUBE FT and PC by waves.See the migration page →
Existing OBPMUpgradeOBPM upgraded together with FLEXCUBE or as a separate step.

When this page is for you

  • Your local payment system is moving to ISO 20022.
  • The bank is launching instant payments.
  • Payments are spread across core modules and satellite systems.
  • Manual repair volumes keep growing.
  • A new core or a FLEXCUBE 14.x upgrade is planned and payments need a new home.

What the bank gets

  • A network map with flows, volumes and cut-offs
  • OBPM design: topology, routing matrix, accounting handoff, HA and DR
  • ISO 20022 mapping specification per network
  • Test evidence for each network and channel
  • An operations runbook for repair queues and cut-offs

After go-live

The team that implemented OBPM supports it, including upgrades of OBPM together with or separately from FLEXCUBE.

Frequently asked questions

More FLEXCUBE services

Start with the network map.

A fixed-scope discovery maps your payment networks, flows and channels and gives you the OBPM design and an estimate.